Ae gt ee Sara ait pe fe ‘. Ft Gre Paes pies Ment aera Se NTE ATTA RE sloth CRRA RE In addition, disbursements would be invoiced at cost throughout the project and total station survey equipment would be invoiced at $100.00 per day. None of the above charge out rates include the Goods and Services Tax which would be added to all invoices at cost. - ENGINEERING BUDGET Based on the terms of reference and the schedule of effort attached, the engineering fixed fees are: A Preliminary design report and preliminary cost estimates. $15,000 Final design, preparation of contract documents, drawings and pre-tender estimates. 25,000 Tendering of contract, evaluation of tenders and recommendation of award y ‘aN Fete 4, f Survey layout, inspection services, material testing, contract administration, as-built drawings, and O&M manuals Golder Associates, geotechnical subconsultant ECL Envirowest Consultants,. environmental subconsultant ‘These fee estimates special equipment. ASSOCIATED ENGINEGRING barreryees ae are My t