-3- The watermain on Atkine is to be upgraded to 200 mm diameter and to provide fire flows to the site. The lane south of Atkins is to be paved for the full length of the site. Sanitary sewer connection to be installed by City forces at developers cost at building permit application. DCC's amounting to 23 Units at $3,780.00 per unit or $86,940.00 are applicable. A DCC trust agreement is required. The minimum heoitable floor elevation for this site is 6.6 meters GSC datum. BUILDING DEPARTMENT : 1. Building height is not permitted to exceed 9 meters between grade and the uppermost floor level. Applicant may need to revise elevations. The Building Code review will be done at the time of Building Permit application. 3. Floodplain minimum elevation to confirm. FIRE DEPARTMENT AND R.C.M.P.: No comments. PARKS AND RECREATION: Landscape plans to be inspected by the Parks Department. DISCUSSION: The proposed building generally conforms to zoning regulations and to the design guidelines outlined in the Official Community Plan. It is recommended that this application be approved subject to the conditions noted above. 44