THE CORPORATION OF THE C 0 U N C CITY OF PorT COQUITLAM AUS 27 1999 MEMORANDUM TOs B.R. Kirk DATE: August 24, 1990 City Administrator FROM: U.R. Zahynacz, P, Eng. City Engineer SUBJECT: Propoxed Temporary Sewer Purp Station, Coast Meridian & Mary Hill Bypass (Public Works Committee Meeting August 21, 1990) Recommendat {ong = tequest for the installation of the temporary Sanitary Pumping station and forcemain Co service 1621 Coast Meridian Roadprovided that the owner agrees to pay the full cost the temporar i ng system, and providedthat the owner ag his fair share of the costs that he would normally Cost Charges and Sanitary Sewers, Background & Comments: At the present time t proceed with the devel along the westside of exlatinyg pump station Lot 21 proposes Co construct a 256 mm (10 inehk) diameter sanitary sewer along eoasy Sanitary sewage Pump station at the y Mill Bypass, plus a 75 ma (3 inch) diameter sanitary forcem Orary pumping station to an existing Sanitary se When the City builds a sanitary sewer along Mary Hill Bypass, Coast Meridian Road, and Broadway the 250 mx dia xy sewer will be connected ta the trunk Sewer on Mary Hil] Bypass and ause the trunk sa i the Pumping station and forcemsin would be abandoned. The attached report £ denonstrates along Kebet Way to accept Committee felt that it was porary basis from Lot 21, The Sewage pumping O pay all the sanitary sewers for developing ») VA cms rc ‘D7 City Engineer fi err arcanones . [ STEM PAGE AUB 12 TPC eee ates econ est enseeceny of the Construction of ree to pay pay towards Development 1621, Coast Meridian Road cannot constructed. The owner of LATE ITEM VAEP I.Re Zahynacz, P.’ Eng, a RECEIVED AT: