April 28th, 1980. but that the construction of storm sewer and sidewalk on the north side of Prairie Avenue between Newberry Street and Cedar Drive be done this year at an estimated cost of $58,000.00. Carried. From the Public Works Committee, April 24th, 1980 recommending that PWC, Apr. 24/ a STOP sign be installed at the intersection of Lombardy Drive and Cedar Sigs Drive. venbardy 6 Moved by Alderman Mabbett: Seconded by Alderman Traboulay: That as recommended by the Public Works Committee, April 24th, 1980 a STOP sign be installed at the intersection of Lombardy Drive and Cedar Drive. Carried. From the Public Works Committee, April 24th, 1980 regarding the PWC, Apr. 24/ redesignation of secondary highway on Kingsway, McLean and Pitt River Secondary Hwy. Road. Moved by Alderman Mabbett: Seconded by Alderman Traboulay: That as recommended by the Public Works Committee, April 24th, 1980 the remainder of the present secondary highway on Kingsway Avenue, McLean Avenue and Pitt River Road be redesignated as secondary highway as set out in the letter from the Ministry of Transportation and Highways dated April 10th, 1980; THAT His Worship the Mayor and the City Clerk be authorized to sign the necessary Agreement on behalf of the City and affix the Corporate Seal thereto; AND THAT the City Clerk be instructed to prepare the necessary By-law. Curried. From the Public Works Committee, April 24th, 1980 recommending that PWC, Apr. 24/ 80 re Paving- a one and one-half inch thickness of asphalt be placed over the whole Shaughnessy ; bet. Wilson & width of Shaughnessy Street between Wilson Avenue and Elgin Avenue at an Elgin. estimated cost of $10,000.00 resulting from the construction of the watermain, and that the money be taken from the Water Utility Budget. Moved by Alderman Mabbett: Seconded by Alderman Traboulay: