rena 14. The soil will be deposited so as to cause no erosion, stability or drainage problems on the property or to neighbouring properties and the following measures will be taken to achieve those objects: (1f insufficient space please attach a clearly marked schedule) 15. After the deposit of the soil on the property the following measures will be taken to stabilize, reclaim, landscape and restore the property: (1£ insufficient space please attach a clearly marked schedule) 16. The following measures will be taken to prevent soil spillage and tracking onto the City's streets and roads, and to clean the same: The following measures will be taken to protect and to keep clear and clean of all sediment, silt, leaching or other fouling or obstruction of wells, natural watercourses, septic fields, water works, sewers and other utilities, drains, ditches, culverts, catch basins and other public works: (if insufficient space please attach a clearly marked schedule) | 2665