i ede seve Preliydi he wd SUE: Roi feet Y ¥} SPL Ye hn a oH x, rf 4 ‘ fyidae ty A Fs ae gg ial hs THE CORPORATION OF THE CITY OF PORT COQUITLAM B.R. Kirk City Administrator That Council approve the installation of a standard catch basin complete with a 200 mim dia. lead in tie lane behind 3471 Sefton Street at an estimated cost of $6,250. That $6,250 be allocated from the Public Works Special Capital Reserve fund for The Public Works Committee considered the attached memorandum from the Project/Traffic Technician regarding a letter from Mr. John Bosco requesting di improvements at 347] Sefton Street. There are existing soak-away type catch basins located in the vacinity of 3471 Seon Street which are not functioning properly; consequently there are flooding problems at the residence in question. — This problem can be resolved by the installation of a catch basin complete with an 8" diameter lead in the lane behind 3471 Sefton at an estimated cost of $6,250. City Engineer ‘ ee oe iat Jim Maiel