20-04-06 DISTRICT oF PORT COQUITLAM Le ~BESCRIPprrong OF THR FOLLOWING ELEMENTS a) Preliminary Engineering pole layout, rough broperty aquisitions, ang briet ign proble me tion of NG *Autacap: (metric) , all ‘ag builss r iccations, underground services, etc., ing -intersection, Trat shall pre-selected by Shaflik En with requirements of pe © Coquitlam, design drawings shal Coquitlam. Contract Preparation Contract Shall inelude Construction of Lump sum Prices sheet, and wings, £ the above shall Standard Contract ort Coquitlam for Zuspection The scope of our inspection would ke as follows: i) Preconstruction meeting with Civil Inspector Contractor. 2) Layout equipment with Contractor, 3) Installation of concrete bases, junction boxes, and conduits (all underground civil works). 4) Check correct installation of wiring, fuses, grounding, connections, Signal poles and related equipment, service equipment, traffic controller Cabinet, ana Seeeckok Loops. 1 AU ere Stee earns Se earns