ae TES Rea ir, Pagel 350 ALBERN! STREET VANCOUVER BRITISH COLUMBIA CANADA V6G 181 FAX (604) 682-3081 TELEPHONE (604) 602-6801 | | TP ANNANDALE, GAren MAAIC M # BARNES, BAreh MAAIC WA CICCOKE, MAAS 0 < MELVILLE, MAAIC rOBY RUSSELL BUCKWELL & partners|| architects : YX February 14, 1994 Our Job No. 1030PM City of Port Coquitlam, Parks & Recreation Department, 2253 Leigh Square, | Port Coquitlam, B.C. V3C 3488 Attention: Mr. Larry Wheeler Deputy Director Dear Sirs: RE: REEVE PARK DEVELOPMENT FIELD #4 ~- COST ESTIMATE we have reviewed the conceptual drawing layouts pertaining to Field #4, located immediately east of the Fieldhouse and submit the following cost estimate to complete the field based upon grading being established at sub-base elevations (iL.e.-compacted and ready to receive drainage, sand base, #tc.). ! Design & documentation-Engineering/Landscaping drainage and specifications $ 17,000.00 Construction — . = Clearing & Grubbing $ 11,500.00 Drainage 112,400.00 Sand ~=©-61,500.00 Hard Landscape 35,000.00 Irrigation 23,300.00 Seeding | 10,500.00 Soft Landscape 35,000.00 7 Ea Equipment oo 30,000.00 320,000.00. Project Management/ Construction Admin. Special _ Consultants & Disbursements 20,000.00 $357,000.00 + G.S.T. (7%) _25,000.00 © oo $382,600.00