SO Ov OS Ya TS’ ENV" TSTOCURTNET NV IC. ARRARAARA i, 26 P.9/718 SCHEDULE °8° COST SHARING At |the request of the Local Authority, the dyke alignment has been chahged from Route B Revised, the least cost dyke alignment, to Rolute Bl. This involves the construction of approximately 300 lineal metres of additional dyke (see attached sketch) and since the water levels will be higher, requires the dykes to be constructed to a higher elevation. The cost of this additional dyke construction will be Ishared equally between the Local Authority and the Province. For, the purposes of this agreement; a.| The ground elevations and dyke cross sections for Reute BL and Route B Revised are assumed to be similar between points A and C on the attached sketch. measured from the b.| The length of Route B Revised, as First-Stage-Final-Design Report, Drawing No. V31M-24-002 is 440 metres. c.| The length of Route Bl (LB1) will be measured following completion of construction.