One of the distinctive Nelson Company trucks loaded ready to take another new home fo its destination. Step-by-step operation of how fo put up your new Nelson home. 1. Basement excavated and footings in place. 2. Basement walls poured, f syn cast-in joists. 3. Forms removed, backfilled and sub-floor on. 4. Centre beam, fele-post and joists with connectors. 5. Exterior panels | <7 erected and roof framed. 6. Shingling and chimney installation. 7. Pre-hung door and windows in place. 8. Tarred paper, starter-strip ce eT a Nig gD LY DI ae SE and siding in progress. 9. Shingling and siding complete; closed to the weather. 10. Electrical, plumbing and heating roughed in; in- sulation started. 11. insulation and polyethylene vapour barrier completed; ready for drywall. 12. Drywall applied, taped and filled; These IWA members are moving lumber from the large stock piles ceiling stippled. 13. Vanity and cabinets installed. into the plant for assembly. ee u ae Window frames are built by this worker on a special “lay-up” table which ensures perfect fit. rT. DES 2 ASO is oe h they will be placed in a pile for the model requiring this particular These workers are loading lumber for a plete home on thi trai arked in the ave Reet ie aos ; designed by the Company for easier loading. an Re Ce eae