By itaawhe haat bynes vie 4 ayy eet scl 7.2. Every Building, permit is the work authorized by the permit is not commenced within six months from the date of issuance of the permit; the work although commenced is not continuously and actively carried out thereafter; or work is substantially discontinued for a period of Six months. 7.3. Each building to be constructed on a site shell have a Separate building permit and shall be assessed a separate building permit fee based on the value of that building. 7.4. A Building Inspector may issue a permit for the construction of a portion of a building before the entire plans and specifications of the whole building have been Submitted or approved, provided adequate information and detailed Statements have been filed complying with all pertinent requirements of ‘the Bylaw. The issuance of the permit notwithstanding, the requirements of this Bylaw apply to the remainder of the building, as if the permit had not been issued. 7.5. No building permit is required for a retaining wall, but the design and construction of a retaining wall greater than 1.2 metres in height shall be Supervised by a Professional Designer. lis greater than 1.2 metres in an and reports prepared by’ the be delivered a Bullding @ys of the preparation of 7.6, No building permit is required for the installation or relocation of a Sign or a sign structure, but no sign permit Shall be issued for a Sign structure in the following circumstances unless the Structure conforms to the Bullding Code: 7.6.1, The sign and Supporting structure have a combined welght in excess of 25 kilograms and are to be attached to a building or structure; A sign structure Supports a freestanding Sign exceeding 4 metres Square in sign area; or