Based on the Hamilton report, the Committee agreed that the signal timing for the McAllister signal should be changed, that curb warning signs and ¢ “tre line reflective markers be placed on Shaughnessy Street near Marpol and Wilson, that pavement markings on Shaughnessy be realigned to provide .eft turn lanes onto Wilson and Marpole, and that pedestrian signal heace and induction loops be installed at Shaughnessy/McAllister intersection. It is estimated that the cost for these improvements would be approximately $20 ,000.00. } ed ao a4 Ga é = I. Zdhynacz, P. City Engine CAE ‘ ¢ 5. : IRZige City Treasurer's Comments: Peg Bee Wa SR rena eed There are adequate funds in the respective budgets to cover the costs of the recommended works. pe ER et AC MEE ELEN Ot City Treasurer