Bel Construction Ltd will be responsible to clear the Access Road, place fill for road subgrade, and gravel and pave the surface at no cost *o the City of Port Coquitlam. Travel Routes through Port Coquitlam The following routes will carry truck traffic to the site: From the North (Figure II) The North access through Port Coquitlam will be from the Lougheed Highway, south on Shaughnessy, east on McAllister, then south on Mary Hill Road to Nacht Avenue. From the South (Figure III) The South access through Port Coquitlam will be from Mary Hill Bypass. north on Mary Hill Road to Nacht Avenue. Estimated Truck Traffic The clearing operation will require that logs be removed from the site. The clearing debris will be left onsite and covered by the filling operation. The log hauling operation will be done in conjunction with the fill placemen™ operation. {item | PAGE | 42 | eee meamnemmeiine