“i aie ietataiey Eve Ns i iH eeditay THE CORPORATION OF THE CLYTY OF PORT COQUITLAM MEMORANDUM Igor Zahynacz, P.t&ng. City Engineer FROM: Andrew de Boer Project Engineer DATE: June 13,1991 BACKGROUND +. A site off of Broadway and Cameron (see attached) was selected as a location for a Recycling Transfer station. The function of the transfer station will be transfer materials from Port Coquitlam to the ETL recycling processing facility in Richmond. The breakdown for the construction and site development costs are as follows: Access Road and Turn Arounds 35,500 Ramo. Construction 46,306 Power and Lighting 8,000 Compactor Set-up 5,885 Consultant: Fees | . 1,750 Fencing Lot Levelling Site Fill Contingencies TOTAL: _ | $164,941 The filling of the site is necessary for proper drainage into ‘Broadway ditch. Endrew de ar Proje ect Engineer