_- THE CORPORATION OF THE CITY OF PORT COQUITLAM + -2— they would require the construction of a new transformer platform with a transformer to operate the old pump from the same line that feeds the new pump station. In addition, before . connected it would have to he © current electrical code. king. The installation of a pumping station with two pumps at Laurier Avenue is estimated to cost $278,000 in 1982. Although the installation of this pumping station would relieve the Dominion Avenue pumping station, we cannot recommend it as & priority in view of the limited funds available in 1982, We have looked into the possibility of adding an additional culvert at the Coast Meridian crossing of Hyde Creek in order to provide sufficient Capacity there. existing culvert has nev » Although the probability of this actually all and it is felt that the cost of a new We will be doing some Cleaning of d perhaps the culvert itself this e the flow somewhat.