4 THE CORPORATION OF THE CITY OF PORT COQUITLAM C 0 U N yu | L | MEMORANDUM - JUL 25 1983 i [ { H t j | TO: B. Kirk, July 21, 1983 City Administrator FROM: FE. Peters., P, Eng., City Engineer SUBJECT: Energy Saving Changes to City Hal! - : Report of Energy Committee Meeting July 20th, 1983 RECOMMENDATION: 1. That the City proceed with the following changes to the City Halt heating and air conditioning System as recommended by D.W.. Thompson during the Energy Seminar: (a2) Provide controls to the boiler to automatically shut the boiler down at outdoor temperatures of 15.60C and _ above. (b) Experiment with the air Supply system to reduce the number of operating hours below what is currently being the boiter water ace sensors rather than from an (e) Provide insulation. to the ramp in the attic and arrange the ramp to move UP and down on Pulley and cable (Ff). Install! atime clock to control! the operation of “o, @xXhaust fans which currently run continuously. (g): Install highly reflective solar filming on the windows on the south side of City Hall to reduce +he solar heat gain, , That O.W. Thompson be hired to Provide engineering services for the items above which require some engineering input. That the approximate cost of $3,500 for ai! the above recommendations be taken from the Energy Conservation Fund in the 1983 Budget, HeLa Rg de Bettany tees