EGHY GF PGR) COQUITLAM MEMORANDUM TO: Mayor ana Council September 19th, 3978 FROM: Public Works Committec Report from the Public Works Committea Meeting held September 13th, 1978. an - IN ATTENDANCE: Alderman 4.1. Mabhett Alderman L.M. Traboulay F.E. Peters, P. Eng., City Engineer ITs] V Lane Behind 1422 rf t Piver Road The lane at the back of 1422 Pitt River Road and is built up above the property by about five feat. attached sketch No. 2 shows the location, ‘The sharp era: from the lane to the property presents a hazard to chilcre to vehicles. Although no vehicles have yet drepoed off th edge of the lane, several children on skate boases hava over the edgoa after coming too fas Place, - The Public Works Committee recommends that a railing be constzucted for approximately 190-feet along this lane to provide scme protection. The cost of under $1,000.00 can be found in the Public Works budget.