ESTIMATES: Site Clearing a) Removal of Trees and undergrowth 22 acres $308.000.00 b) Grading level and removal of top soil 22 acres $200,000.90 c) Pre-loading site in area of running track $400.000.00 SUB TOTAL $908,000.00 $998,000.00 Track and Field Facilities a) Asphalt Base Constructic with perimeter drainage system $250,000.00 Resilient Synthetic Track Surfacing $350,000.00 Playing Field inside Track Oval $180,000.00 Track & Field Equipment S$ 80,000.00 SUB TOTAL $860,000.00 $860,000.00 Flood Lighting System $130,000.00 Site Services, Water supply and Storm Drains on site s 50,000.00 ‘ Consulting and Engineering Services $156,000.00 TOTAL ESTIMATE. $2,104,000.00 Included in the cost estimates is the clearing and grading of the total site, some credits may be applicable to preloading materials and top soil. If additional playing fields and ball parks can be construction on the site then allow a budget of $150,000.00 per field. We would welcome the opportunity to meet with yourself and staff to review this report and cost estimates. STEM | PAGE ' —) ‘ “". 04025 A, | RON DAVIES PRESIDENT