SCHEDULE "A" - Page Two The Works included are those works identified in the following two reports, except those works located in the lands to the south of the Lougheed Highway and in the Lougheed Highway sub-area to the west of Coast Mendian Road: City of Port Coquitlam - Engineering For Master Drainage Plan - Northeast Sector Development - December 1990 as prepared by Dayton & Knight Ltd.: : and City of Port Coquitlam - Northeast Sector Development Strategy - A Comprehensive Development Planning Program - March 1991 as prepared by Urban Systems Ltd, (Drainage portion only) These works are generally described as the general engineering calculation for the master drainage plan for the Northeast Sector Development and the selected alternative of floodproofing using Alternative no. 1 in the Dayton & Knight report, the design and construction of the pump station sizing and components that result from the engineering work; the design and cleaning and re-establishing of drainage ditches along Dominion Avenue, Bums Road as well as other adjacent and integral drainage ditches making up the storm water management system for the Works; inspection of all works and certification to the City that they have built in accordance with the approved drawings and specifications. a Pena | / NeEud of Document |