This required elevations shali 5b used for installation of fixed cusceptl to. damage by floodwater. ~andfiil used to raise the Ground elevation, the face of the i slope shall adequately protected erosion flood flow The owner agrees c post and maintain prominent cigns in any undercover parking areas below the Flood Construction Level stating, ‘This Parking Area May Be Subject to Flooding’. The owner ‘acknowledges that the Province of British Columbia does not vepresent ¢ the owner or any other person that any building constructed Or mobile home tocated accordance with paragraoh (2) and (2) here will not be damaged by flooding or erosion, and the owner covenants and agrees not to claim damages from the Province or the City of Port Coquitlam or hoid the Province or the City of Port Coquitlam responsible for damages caused by flooding or erosion to the land or to any building, improvement, or other structure built, constructed or placed upon the said lands and to any contents thereof." amende agreement 1 From tne cate hereof be construed along with the said document 44206722 and be 7 Pe f said document amended. art thereof with respect to the lands described herel 4A206722---shall be regarded as being__h ad oby a ar aS may be necessary to effectuate these presents ereby