we EN CITY OF PORT COQUITLAM FEB 28 1994 REPORT TO COUNCIL MEMORANDUM TO: J. Maitland, DATE: February 23, 1994 Acting City Administrator FROM: LR. Zahynacz, P. Eng., FILE: PWC City Engineer SUBJECT: ENGINEERING DESIGN - ROADS, DRAINAGE, WATER AND > SANITARY SEWER DCC PROJECTS (Public Works Commitice Mecting of February 22, 1994) RECOMMENDATION: That Councii authorize the Engineering Department to proceed with requesting proposals for the Engineering [’esign portion of the 19 rcads, drainage, water and sanitary sewer development cost charge projects as listed in the attached proposed 1994 Capital Budget. BACKGRP.OUND & COMMENTS: The Public Works Committee considered the attached memorandum dated February 16, 1994 from the Project Engineer regarding the Engineering Design for the proposed 1994 Development Cost Charge Projects. The Engineering Design for these projects be completed as soon as possible so that these projects are constructed during the better construction season. After bids are received for the engineering/consulting work. a report will be forwarded to Council for the selection of specific consultants for these DCC Projects and the proposed funding of the works. Attached is Table 1 showing the list of DCC Projects and the proposed schedule for the engineering design. IRZ:cd LR Zahynacs PERG a eer Attachments Zz