THE CORPORATION OF THE CITY OF PORT COQUITLAM TO: LR. Zahynacz, P.Eng. DATE: November 29 1993 City Engineer FROM: Anne T. Pynenburg PROJECT: No. 804 Project Technician SUBJECT: REQUEST FOR CATCH BASIN AT 3579 ST. ANNE ST. RECOMMENDATION: Turn down request for installation of catch basin in front of property at 3579 St. Anne St. BACKGROUND & COMMENTS: Attached is a letter from the residents of 3579 St. Anne St. requesting that the Engineering Dept. install a catch basin in front of their property. Reason For Request The residents are concerned about the lack of drainage at the end of their driveway. They feel that a catch basin will solve the problem. Cause Of Problem The low area is a result of the driveway being paved with an improper base prep on the boulevard portion. This has caused the ground to sink creating a depression for water to fill up. Please note that this driveway portion is on City property and was probably installed without permission from the City. _ | pe Solutions 1) > Fill in area by applying asphalt to the boulevard portion of the driveway at a cost of | | APPIOX.: | | _ -$200 for cold mix | Ce | -$700 for hot raix Request that the owners remove the asphalt portion on the boulevard and City crews to grade shoulder with gravel to fill in depression at a cost to the City of regular road maintenance, | oo SO es a City crews to remove asphalt and grade shoulder at a cost of approx. $500, act = - ° A — Anne T. Pynenburg Project Technician | attach