REEVE.XLS ENGINEERING SERVICES REEVE ST. / HAWTHORNE AVE. PROJECT Consultant Design & Tendering & 7 St. Light Geotechnical | Geotechnical GST TOTAL TOTAL (8 wk Contract Doc. | Construction Design Testing Const Period) 18,117.50 19,944.00 3,846.00 ยง,500.00 8,681.00 3,926.20 60,015 63,855 26,120.00 20,880.00 3,726.00 4,000.00 6500.00 * fi. . 31.62 65,512 65,512 30,175.00 25,300.00 included 5,500.00 8,681.00 4,875.92 74,532 74,532 26,419.00 39,710.00 3,726.00 4,000.00 4,500.00 5,484.85 83,840 83,840 32,778.00 44,860.00 included 5,500.00 8,681.00 6,427.33 98,246 93,306 39,300.00 45,052.00 1,800.00 4,000.06 4,500.00 6,625.64 | 101,278 94,678 45,300.00 45,500.00 included 5,500.00 10,000.00 7,441.00 | 113,744 109,501 * Based on average costs