Ws aloes 4 : r iy oe a Vaig: + i ae ars 5 : THE CORPORATION OF THE CITY OF PORT COQUITLAM MEMORANDUM TO LR. Zahynacz, P. Eng. DATE: April 19, 1991 City Engineer FROM: C.F. Morris Engineering Technician SUBJECT: Catch Basin Request - 3863 Robin Steve Brown and I investigated this request on April 18, 1991 and by viewing in the field it was established that an additional catch basin be installed at the low section of the cul-de-sac directly in the middle of the driveway. The approx. cost for this installation would be $2,500. which basin and some remedial asphalt skin patching. F ‘Mirris, Engineering echnician CONITLAM oie IG CEPT. menos ere et . ee meee | i ~~! MM ‘ we ena ee os nete “ a ao one 8 da sae. Corre :