THE CORPORATION OF THE CITY OF PORT COQUITLAN LAND USE CONTRACT SCHEDULE "p"! Section 1 - Works to be constructed by Trinoda Holdings Limited as provided in Section 12. Approximate Amount of beposit Required Type Cost Breakdown by Way of Letter of tredit § Sanitary Sewer 12;525.00 ) ) Storm Sewer 20,925.00 } ) Lane . 4,350.00 ) . )—-—-—--+-----§ 48,680.00 Underground Wiring 2,000.00 ) > Landscaped Lane (existing ) Yoad allowance) : 6,000.00 ) : ) Fill in Ditch 2,880.00 } aaa palit Section 2 - Amounts to be paid to the Municipality as Provided in Section 12, {- ce Typ : Payment Required $ Sanitary Sever Tie-in . : 1,000.00 Storm Sever Tie-in 500.06 42 Parcels to be Created at $20.00 . per Parcel 420.00 Plans Approval Fee 2.00 Engineering Fees 1,947.00 Water Capital Pund Contribution 12,600.00 Driveway Let-down 2,000.00 Storm Sever (subject te refund as provided in Section 12 of this Land Use Contract) 4,400.00 Total $ 62,469.00 nen | The Building Permit Fee Payable based on the value of construction set out in Clause (a) of Appendix "A" of che “City of Port Coquitlam Building and Plumbing Code Adninistration By-law, 1974, Ne. 1298" shall be estimated and paid at the time of applicatio mit. The inspection fee of "A" for each of the 42 ted under the terms of The Dollar anounts stated in Section 1 of this Schedule are based on ¢ Preliminary Engineering Design and Preliminary Cost Estinates. Engineering Destco the D Any increased costs over and be the responsibility of the