THE CORPORATION OF THE CITY OF PORT COQUITLAM Igor Zahynacz November 19, 1990 City Engineer Steve Hrown Assistant Operations Mer. Sidewalk on Pitt River Road The original request for the installation of sidewalk on Pitt River Road come trom several le¢al residents between Nova Scotia and Harbour in August of 1989. The residents complained that road run off Flooded their front yards and walkways during both spring and fall rains. The sidewalk installation was intended to prevent road run-off from entering private property and thus eliminating the water problen. It is recommended that the design take this factor into consideration, including curb and gutter in the final design. Enclosed, please find my estimates for the proposed designs. Respectfully submitted, Steve Brown SB/al encl,. cc Kip Gaudry Gordon Voncina