FIGURE 8 ROAD DCC CONSTRUCTION SCHEDULE LOCATION 84.823 $97,376 657,165 1,718 522 1,003,130 7.080.120 FOAL 0.365 200) 4,716,572 4,218,527 QS7,108 1,409,090 t778732_ 1,207,198 1,