om . ’ THE CORPORATION OF THE CITY OF PoRT COQUITLAM MEMORANDUM Soe Building & Protection Committee January 15, 1991 F.E. Peters, P. Eng., City Engineer Drainage Alternatives -~ Cedar Drive Area The following alterna reduce the flooding of Cedar into the ditch. 1. New Pumping station to Pump Glade Court/Fraser Avenue area to ditch when ditch is high, (Relieves immediate concern - i.e, Boxing Day storm. Would be of little help if Cedar ditch overflows - i.e, Dec., 1979 storm.) Non-engineered estimate $105,000 Downstream improvements to Cedar ditch - widening and new culvert at Huber (see attached cross- section). (Allows discharge from Cedar ditch to run off quickl Non-engineered estimate Dyke improvements to prevent Over-topping at Fraser, Evergreen Par , etc. (Would ' be of no help to Glade area without a pump to get water Over the dyke.) § 59,000 Breaking dyke on east side of Cedar ditch in er level in ditch by al area. Requires ditch (Would be effective to prevent flooding to Glade. area but would increase flooding on agricultural May also require new right-of-way,