const.cost.est. ‘ advising that upon receiving approval from Council, further design work August 14th, 1978 under date of August 9th, 1978 for a proposed work of local improvement on Hamilton Street, from Patricia Avenue to Lincoln Avenue in the total amount of $63,630.00 to include storm sewer, road, curb and boulevard, be approved. Carried. : From the City Engineer, August $th, 1978 being the construction City.Eng. re | | a const.cost.est. . eae for Langan loc. — improvements cost estimate for proposed works of local improvement on Langan Avenue, from Brown Street to Broadway Street, including storm sewer, road, curb and gutter and boulevaid at a total estimated cost of $93,915.00. Moved by Alderman Traboulay: , po nS Seconded by Alderman Mabbett: That the Construction Cost Estimate submitted by the City Engineer ‘under date of August 9th,1978 for a proposed work of local improvement on Langan Avenue, from Brown Street to Broadway Street, in the total amount of $93,915.00 to include storm sewer, road, curb and gutter and boulevard, be approved. Carried. From the City Engineer, August 9th, 1978 being the construction City Eng. re cost estimate for proposed works of local improvement on Grant Avenue, for Grant local improvements oo, pees from Wellington Street to Coast Meridian Road, including storm sewer, : ; - ey road, curb and boulevard at a total estimated cost of $85,985.00. Moved by Alderman Traboulay: Seconded by Alderman Mabbett: That the Construction Cost Estimate submitted by the City Engineer under date of August 9th, 1978 for a proposed work of local improvement i on Grant Avenue, from Wellington Street to Coast Meridian Road, in the . amount of $85,985.00 to include storm sewer, road, curb and beulevard, be approved. Carried. City Eng. Aug 10/ From the City Engineer, August 10th, 1978 being the report on an re preliminary. preliminary cost estimates of proposed works of local improvement on St. cost est. for local improve. Anne Street - Dorset to Lincoln; on Essex Avenue — Lane East of Cedar to St.Anne/Essex/ Newberry St. Thomas Street; and on Newberry Street — Fraser to Prairie, and and detailed estimates would be carried out. Moved by Alderman Laking: Seconded by Alderman Mabbett: Tnat with respect to the August 10th, 1978 report of the City