Cc) ALL of. the fixtures in Table 7.4.9.4 of the British Columbia Plumbing Code with the addition of the following are subject to the above fees: vacuum. breaker hydraulic equipment sewage sump oil interceptor grease interceptor gasoline interceptor neutralizer double check valve assembly. (d)) No fee or part thereof in payment of a Plumbing Permit, as required by this By-law, shall be refunded if the: work authorized by the permit has been commenced; but if no work has been commenced. and a Plumbing Inspector so certifies, the City Treasurer may refund 90% of the Plumbing Permit Fee; however, no refund shall be made om. amounts of less than $25.00. 3, Schedule of Bui lding Demolition Permit Fees Value of Structure to be Demolished Permit Fee Payable $ bi up to $1,000.00 .......e ese e cece eee eees NEL $1,001.00 and over ....... ccc ceca eceeee 5.00 Reinspection Fee Where, due to noncompliance with the provisions of this By-law or to. unsatisfactory worlmanship, more than two inspections are necessary, for each inspection after the second inspection, a fee of $21.00.