July 20, 1987 /200 yo Moved by Alderman Wright: Seconded by Alderman Farnworth: That a restrictive covenant authorizing a roof overhang into a City sewer right-of-way aT 960 Victoria Drive be authorized and that the Mayor and Clerk be authorized To sign the encroachment agreement. Carried. PW/17/87/07/20/ 65 From the Deput referring to the proposed relocation of a CelesTe. y City Engineer/Operations Manager, July 16, 1987 water pressure sensor at Moved by Alderman Wright: Seconded by Alderman Farnworth: That the approved budget for the relocation of the pressure sensor at Celeste be increased to $5,000 and that the additional increase in cost be funded from The Unallocated Water Capita! Account. Carried. PW/18/87/07/20/66 From the Deputy referring to the Tender for reconstruct City Engineer/Operations Manager, July 16, 1987 : ion of Pitt River Road. wom Moved by Alderman Wright: Seconded by Aiderman Farnworth: That the Pitt River Road Reconstruction Project be awarded to the lowest tender, Bel Construction, at a bid price of $404,394. Carried. Vo Ne | PW/19/87/07/20/71 | From the Deputy C referring to the insta} Drive. ity Engineer/Operations Manager, July 16, 1987 tation of Safety Ralls at north Lombardy and Cedar Byte warren Moved by Alderman Farnworth: Seconded by Alderman Laking: CCR ELEN TATA nstalled at The southwest corner of north and that the estimated cost for this work of Works Unallocated Budget. That safety rails be | Lombardy and Cedar Drives $600 be funded from the Public Shee: spat eoeec teeta eee tae an RRA Carried. PZ/20/87/07/20/72 From the Director of Community Planning, July 6, 1987 referring to Rezoning Application No. 19/87 affecting property at 3950 Newberry Street. apart Scie ct ae te aE PN AER RAE ED