A plan processing fee shall be payable before processing of a building, building moving, plumbing or eign permit application as follows: 4.1. For & permit application to construct a new Single family dwelling, a fee of $100.00. 4.2. For a permit application for a building or structure other than a new single family dwelling @ fee equal to fifty percent of the permit fee under Section 1, to a minimum of $50.00 and a maximum of $2,500.00. 4.3 For a plumbing permit, type: fireline/sprinkler or on-site ‘services, a fee of $50.00. 4.4 For a sign permit, a fee of $50.00. 4.5. For a building moving permit, a fee of $50.00. 4.6. The plan processing fee will be credited to the building, building meving, plumbing or sign permit fee at permit issuance. An applicant for a Building, Building Moving, Demolition, Plumbing or Sign permit may obtain a refund of the Permit Fee when a permit is surrendered and cancelled before any construction begins, on the following basis: 3-1. The City Treasurer shall refund ninety percent of the balance of the permit fee in excesa of the plan processing fee. | A plan processing fee is not refundable. No refund shall be made where construction or work bas begun or an inapection has been made. : No refund shall be made for an amount of $50.00 or less.