There are two scenarios: 1. A simple subdivision of from 2-4 lots requiring no servicing which it is necessary to design and construct. This should have a standard fee which at present is $50.00 for one lot. A subdivision requiring services that necessitate design approvals, estimates, bonding and as-built drawings. This fee can apply on a cost/lot basis, added to the standard fee. The Process ' receive application - take fee, assign number - create file - change map - fill out checklist - produce comment sheets for Fire Department, Building Department, Parks Department, Planning Department - prepare T.A.. Carolyn 4 hrs. @ $19.00 = $76.00 [Fixe Department| - 1/2 hr. @ $25.00 = $12.50 planning Depaxcteent | - 1/2 hr. for small subdivision @ $25.00 = $12.50 1 hr. for each additional 5 lots @ $30.00 = $30.00 Building Department | - 1/2 hr. for small subdivision @ $25.00 = $12.50 [Parks Department | - 1/2 hr. @ $25.00 = $12.50 [clerks Departwent| - 1/2 hr. for small subdivision @ $25.00 = $12.50 1 hr. for each additional 5 lots @ $40.00 = $40.00 - establish servicing requirement - review consultant preliminary drawings - complete checklist - provide owner consultant with list - ist and 2nd review of drawings - produce estimate - approval of drawings - review utility company drawings and requirements - approved utility designs and estimates. 7 hrs. for small subdivision @ $30.00 = $210.00 45 hrs. for subdivision with offsite services up to 15 lots @ $36.00 = $1,350.00. eer e mees o. ITER eG “ads,