hed Pane aN 698 5G" : ! irae Lvea yy : wg ai ie el ' RUA fran ae rat as it enaeane 4 Ed as SI aT a io UR RCM felt Aaa, : ; EB Pa : Hoke ae Te acta peop th epee f oe at iatan shite THE CORPORATION OF THE | ee CITY OF PORT COQUITLAM oe MEMORANDUM Igor Zahynacz, P.Eng. City Engineer Andrew de Boer Project Engineer 1.6 RECOMMENDATIONS 1.1) That the eight bus stops requested by BC Transit for the #159 Re-route via. Citadel to Mary Hill Road be approved. 1.2) That the two bus stops requested for Pitt River Road at Harbour southbound and northbound be approved. 1.3) That the bus stop request at Eastbound Pitt River Road at Tyner be approved. 1.4) That $2000 be allocated towards installation of "no-stopping bus zone" signs at the approved locations. 2.0 BACKGROUND AND COMMENTS With the opening of Citadel Drive to Mary Hill road, BC Transit has requested an extension of the bus route. The attached sketch indicates the eight stop locations requested. As well BC transit has requested two new bus stops on Pitt River and Harbour, | northbound and southbound and one stop on eastbound Pitt River Road and Tyner. BC Transit has receive numerous requests from residents for stops at the Pitt River Road and Harbour locations.