THE CORPORATION OF THE CITY OF PORT COQUITLAM . Report from Building and Protection Committee Meeting Recommendation: That a Hi-Ranger Snorkel on a Freightliner chassis with the additional equipment as shown in the tender bé ordered from Anderson's Engineering Ltd., 22624 Fraser Highway, R.R. #3, Langley, B.C., for the sum of $209,419.35 inclusive of ail taxes. The Freightliner chassis was chosen over the International because the Hi~Ranger Snorkel mounted on an International chassis is too high. The overall height while driving for the Freightliner is 144 inches, International is 155 inches and the Scot is 151 inches. Even at a height of 144 inches some modifications will be necessary to -No. 1 Firehall. Respectfully submitted, OZ eg epee ~~ W.S. Wingrove, ZL Fire Chief Nore: See previous reports attached . Cir Coen