ll PC Meeting July 20, 1993 Cont'd COMMENTS FROM OTHER DEPARTMENTS Engineering Department: 1. Installation of new water, sanitary sewer and storr sewer service connections will be required for the new lot. A driveway letdown will also be required. These will be installed by the City at the developer's cost at the building permit application. 2. Development Cost Charges for one lot will be applicable. Buildi D rtment Tr. Floodplain criteria will apply to new buildings on future lots. 2. Location of the existing non-conforming building to be resolved. Park nd Recreatior, Fire and R.C.M.P, Departnents No comments. DISCUSSION: The proposed two-lot subdivision generally conforms to the Zoning Bylaw requirements for the RS-2 zone. Approval of this Rezoning Application wi. permit the construction of 2 new single family residences in conformity: .th the Official Community Plan Policy for infill neighborhood residential The proposed lots should blend well in this area with a mixture of narrow & wide lots. va Carlos-Feli “/Arch., M.C.I.P. Registered Planner, Director of Planning / DV/al 1D641/9-10 TEM TP