td i ee Ve ey pete REPORT April 26th, 1974 from the Public held Wednesday, April 24c¢h, Aicerman ¥A, Thompson Aicgerman J.J, Keryluk Mes. J. Pleasants, The Enterprise V.G. Borch, ?, Eng. Respectfully Submitted. anders war esday, April 2nd, 1974 for the instali- e South Side : follows: Standard Gen § 153,690.00 H.B. Contrae 214,946.00 A copy of a letter from Dayton & Knight Led. dated April 4th, 1974 is attached hereto, . An updated estimate of the. cost of this project was prepared in November 1973 and the Committee and Council were advised by the City Engineer that.this estimated cost was $220,000.00. This included $19,000.00 for the connection to the G.V.W.D, main and $36,000.00 for Engineering and contingencies. On page two of the April 4th, 1974 letter from Dayton & Knight the total cost of the project is shown now as $240,615.00 based on the Standard General Tender of $153,690.00, in fact the total cost should be shown as $295,615.00 because the $19,000.00, and $36,000.00 amounts referred to above must be in- cluded. Therefore this project is some $75,000.60 over the November 1973 estimate if the Standard General Tender is accepted, - The City Engineer has wecently been advised by Dayton & Knight that the proposed location of the South Side Supply Main is in doubt. App- arently a previously obtained approval from B.C. Hydro to locate the supply main on 3.C. Hydro property has been cancelled, This of course is now under discussion, but i£ the cancellation is final a redesign and relocation to a greater or less degree will be necessary, The Committee recommends that both tenders received be rejected because: 1. The Location of a8 in doubt, 2. ubstantially over previous estimates, lacccacecs