THE CORPGRATION OF THE CITY OF PORT COQUITLAM C 0 U

MEMORANDUM OCT 31 1983

TO: B. Kirk, October 26, 1983.
City Administrator

FROM: FE. Peters., P, Eng.,
City Engineer

SUBJECT: 1983 Unallocated Funds in Water Budget -
Public Works Committee, October 25th, 1983

RECOMMENDATION:

That Counci} approve the projects listed as Nos, 1
ort from the Assistant City Engineer to
nd that this work be done out of the

In the Unallocated Water Capita! Budget,

BACKGROUND AND COMMENTS:

A total of $200,000 was teft unaltocated. in. the 1983
Water Capita! Budget, A portion of this budget was allocated
during the year to the construction of a new watermain to serva
the Carnoustie Golf Course. Final costs. tor our share of the
Carnoustie watermain are about $75,000 leaving. $125,000 as
unallocated in: the fund. 3

a Water Network
Projects Engineer, been completed and
members of Counci{ have received a separate copy of this
report. The report investigates ali of the north side of the
Gity to determine the areas where water supply is. inadequate,
A numberof trials of the water network have been made using
various construction options and those options which are most
etfective in’ solving the water deficiencies are included tn a
list of eighteen proposed improvements at the end of the
Speciai Project Engineer's report. This list has been reduced

down to five for the 1983 Program.

[It will not be possible for the des ign and

construction of these five projects to be completed in 1983,
1f Council approves these projects, it would be our intention
to carry the funds forward into 1984 and to complete the
projects in the spring of 1984, This wit! give, us some work to
do while’ awaiting the 1984 Budget approval},

4
F.E. Pofers., Pr Eng., 7
City Engineer

AE ENON ASIN atta eh I ne tee name, ta ane inten te ae

Be PY yo Sante

tt

FEP/sgg
Attachment
R11

7

OTS rd BS dtem nee Ee BA tag adealth oS pant wataitennsne se Fe on ea a a » ee Neeeitle ier iy
Baath hClD THAW Gia

De