_ THE CORPORATION OF THE ciTy OF PORT COQUITLAM

~2-

With reference to 6, above, this was discussed at the meeting of
“the Public Works Committee held Tuesday, January 2ist, 1975. The Committee
recommends that Crippen Engineering Ltd. be engaged by the City to investigate
the following:

.C.P.R. tracks which drains to the Harbour Street Pump Station and the Cedar
Ditch - Hyde Creek area. ,

_ a 2. © Preliminary design of the main drainage ditches, pump station
and flood boxes necessary to dispose of the instantaneous flow detailed ‘in
1. above.
3. Estimates to determine the capital cost of. the disposal required
for flow conditions in the selected areas in 1, above. —

This work would. not commit the City to Proceed with any capital
expenditure beyond the scope of the Friuser River Flood Control Programme.
» It. would outline what could be done, either at the time of the programme
so projector subsequent to the project completion to provide for the 10
.., year. rainfall flow in the two areas where it might be felt necessary to so
oro aoa. The cost of engaging Crippen Engineering Ltd. will be approximately
* $10,000.

VGB/vw. . 7 —_ a Reapect'£ ly submittéd,
Att'd, . J a

V.G. Borch¢ P. Eng.,
City Engineer,