THE CORPORATION OF THE CITY OF PORT COQUITLAM LAND USE CONTRACT SCHEDULE "p" Section 1 - Works to be constructed by London Woodvorking, Enterprises Ltd. as provided in Section 12. Type Approximate - Amount of Deposit Required Cost Breakdown by Way of Letter of Credit $ Waternains 3,600.00 ) ) Road Paving . 850.00 ) ) Curb, Cutter & Boulevard 1,900.00 )~ -~ --- $9,350.00 Underground Electrical > Installations 1,500.00 ) ) Sidewalk Rebuilding 2,500.00 ) Section 2 ~ Amounts to be paid to the Municipality as provided in Section 12. Type Payment Required $ Waternain Tie-in 700.00 Storm Sewer Connection 300.00 Parcel Creation Fee (5 Parcels @ $10.) 50.00 Plans Approval Fee 2.00 Engineering Inspection 374.00 Water Capital Fund Contribution 1,500.C0 Total 2,926.00 The Dollar amounts stated in Section 1 of this Schedule are based on the City's Preliminary Engincering Design and Preliminary Cost Estizates. As a result of Final Engineering Design to be carried out by the Developer, quantities, locations, sizes, etc. might vary from that determined from the Prelizinary work and the City does not in any way ensure that actual increased costs resulting from the Final Approved Engineering Design and Tender Call will ‘not occur. Any increased costs over and above the stated bonding amount of $9,350.00 shall be the | responsibility of the Developer.