t weed ; ; BEE We ng! she eepe J a eee CRS Bele S hea ER alas A LN tee PNA rite ; * ‘ Etettd 4 ia f} : an act Heath apt Wie aie i LAY ue Vinson DSA ew whe falatag teh giv te a Pd Oy Reel : , oy 2 barra t Y ¥ eb Bee Ra she fn f; peters fitiee rah eabagea:g jet y Pt 2 MGe, aah cy a PORE Coa (dhanesqot | O/T /04 12:29 SICA HY HAAN MIERAU CONST 'N mee COST ANALYSIS HYDE CREEK REC. CENTRE Aor. 6/94 Original Glooal Undated |___ Actual Over Budget Budget Current (Under) Pratim. Committed | Budaqet Section Trades 0000 Admin, $254,000 $254,000 $254,000 30 $19,000 $15 000 $23,000 $23,000 $1,500 $1,500 Insurance $7,820 _| $7,820 Concrete testing | $2,000 $2.000 Soils testing $3,000 $3,000 Allowance for hydra and conn. fees $17.500 $17,500 Bond trades aver $50,000. $32,000 $28,375 Hoardings $5,700 $5,700 Site security $14,000 $14,000 Garbaae fasc, $7,000 $7,000 Photus $500 $500 Sanitary fasc. $1,250 $1,250 Proj. sign $710 $710 First aid $22,750 $22,750 Site telephone, fax $6,750 $6,780 Temp, utilities $15,689 $15,689 Janitorial $3,349 $3,349 Constr, mnamntlees, incl super.& altic Reimbursible costs 01000 General Requirement Pennit Survey Demolition and asbestos removal $110,504 $90,054 ($11,514 Additional hoardings and patching included $32,454 | Excavation and fill, incl site demo $109,971 $94,800 $5,291 | Additional cost of berming 21 $14 462 Site improvements $18,000 $15,000 03000 Concrete Foundations and $.0.C, $121: 547 S165, 272 Foundations to qym storage included $4,600 Concrete supply (394M3) included $20,732 Reinf. sd for fadts. and soq $10,875 $17,355 Reinf. oym storage Mm. included $500 Pool structures _ $73,801 |_in indins, Rlockwork $62,058 $62,055 Brick verter $69,930 $69,930 Glass block $2,779 $2,773 Stuctral steal & stairs $347,333 | $335,000 (55,272) Sinict sheel to Gym Stor, incl. ding) $4,960 Selsmic upgrade $79,000 $29,000 Decking $50,290 | in str. suzel Metal Fabrications And stl stairs $17,646 $20,645 C6000 Camenty Rough carpentry $22,954 $19,744 Architectural Woodwork | $79,684 $79,684. 07000 Thermal Glevator pit waterproofing $290 Damproofing " $A5S Roofing $183,400 Roof tratch $725 rigid insulation -firdtn $2,712 Thennal insulation - batt $7,959 ihe bye? beter’,