lity: Sige Wt thy 4 om che i Men § \ i ; di M 5 shpat y i: : ia. # Mois v8 rie 7 ; ae irene Meith i \ Laas iat Pea eae ; i sete SR a eet shalt PASAY an tee. Costs: Road Resurfacing $ 30,000 Contingency $ 3,000 Engineering $ 3,000 GST $2,000 SUBTOTAL: | $ 38,000. Comments: Tyner is local road with a nominal 6 metre pavement width. The section between Central and Pitt River is adjacent to Mary Hill Junior Secondary and has severe alligator cracking. Andrew de Boer Project Engineer copies Kip Gaudry, Deputy Engineer ‘Gordon Voncina, Operations Mg Jim Maitland, Treasurer |