THE CORPORATION OF THE CITY OF PORT COQUITLAM MEMORANDUM APR 29 198% TO B.R. Kirk DATE: April 24, 1991 City Administrator FROM IR. Zahynacz, P. Eng. City Engineer SUBJECT: REQUEST FOR STORM DRAIN - 3863 ROBIN PLACE ‘ommitive Meeting of April 23, 1991) That the City of Port Coquitlam approve the installation of a catch basin at the south end of Robin Place at an estimated cost of $2,500.00. That $2,500.00 be allocated from the Special Public Works Reserve for this purpose. The Public Works Committee considered the attached memorandum from the City Engineer regarding the request from Robert Mora of 3863 Robin Place for the installation of a catch basin at the south end of Robin Place to alleviate a drainage problem. | The Committee noted that there has been a drainage problem at this location for several years” and last winter there was flooding at the basement of 3863 Robin Place due to run off from the road. z There is a storm sewer nearby that runs through a portion of Robin Place, and a catch basin. constructed at the south end of the Robin Place tum around could be connected to this ston sewer, . —— IRZ: gC Attachments ait land, City Treasurer