THE CORPORATION OF THE CITY OF PORT COQUITLAM Public Works Committee Page 3 December 22nd, 1978 ITEM IIL (continued) c. Poor connections between certain services were also cited. Copies of the correspondence were provided to B.C. Hydro and the suggestions were well received. B.C. Hydro will be responding individually to each of the letters to let the people kmow that their suggestions will be considered. Dave Walker felt that some of the suggestions could be implemented at this time as schedule changes were being prepared and that the letters were very timely. This is for your information and no further action is required. ITEM IV Rez Pacific Stage Lines Stop ~ McAllister It was pointed out that the Pacific Stage Lines bus sometimes does not pull into the bus stop as far as possible and as a result creates traffic congestion on McAllistér. Dave Walker replied that these buses have more difficulty in negotiating City streets because of their design but that a possible timed interchange on the Lougheed Highway was being considered to eliminate the need for these buses to enter the City. This is also for your information. City Engineer FEP/alg attachments: 1 & 2 ce: Mr. Dave Walker B.C. Hydro